The Roof
After sorting out the roof, including installing a new scaffolding, Patchy installed roof windows into the building, which blessed the house with natural light. His electrician had already completed the first round of wiring, and the insulation process was almost complete.
The stonework outside saw a complete overhaul before Patchy and his team installed plasterboards inside to make the place look cleaner. As time flew by, the house was slowly taking shape.